Property Owner | |
---|---|
Your Name | Kimberly Dryden |
Email hidden; Javascript is required. | |
Phone | 757-232-2622 |
Lot(s) # | 185 |
Your Address | 692 Peninsula Dr Prosperity 29127 United States Map It |
Project Type |
|
Contractor | Alexis Castro Foundations |
Date | 08/08/2024 |
For Alterations to an Existing Structure | |
Alteration Description | Replacing the existing concrete driveway with a new concrete driveway. The concrete will be four inches thick with wire mesh and control joints. The removal of the existing driveway and pouring of the new driveway should take at the most 4-5 days depending on weather. Expected to be done in September 2024. |
Re-Painting | |
Re-Roofing | |
Landscape Alterations |